Key Points
• Brine from the Laguna Verde project is being fed into DLE columns where
lithium chloride is extracted onto the adsorbent, before desorption with
water to create a purified lithium chloride eluate.
• A reverse osmosis unit at the pilot plant will be used to concentrate the
eluate.
• The pilot plant has a design capacity of 1 tonne per month lithium carbonate
equivalent (LCE) as concentrated eluate.
• The appropriate volume of each batch will be based on end user
requirements ....

20 Mar 2024
FLASH NOTE: Pilot Plant Commences Operations

Sign up to access
Get access to our full offering from over 30 providers
Get access to our full offering from over 30 providers
FLASH NOTE: Pilot Plant Commences Operations
CleanTech Lithium PLC (CTL:LON) | 6.0 0 0.0% | Mkt Cap: 6.02m
- Published:
20 Mar 2024 -
Author:
Peter Rose -
Pages:
6 -
Key Points
• Brine from the Laguna Verde project is being fed into DLE columns where
lithium chloride is extracted onto the adsorbent, before desorption with
water to create a purified lithium chloride eluate.
• A reverse osmosis unit at the pilot plant will be used to concentrate the
eluate.
• The pilot plant has a design capacity of 1 tonne per month lithium carbonate
equivalent (LCE) as concentrated eluate.
• The appropriate volume of each batch will be based on end user
requirements ....