Victoria Gold (VIT) has released an updated feasibility study (FS) for the Eagle Gold Project in the Yukon, which includes run-of-mine ore from Eagle, higher-grade Olive ore, and accounts for the lower mine construction costs in Canada and the current prices for materials and process reagents. These new inputs have positively influenced operating costs (C1 estimated at US$539/oz, AISC at US$638/oz) and shortened construction from two years to one, while maintaining environmental standards. Fu
20 Sep 2016
Eagle: A very robust, large, low-cost gold project
Sign up to access
Get access to our full offering from over 30 providers
Get access to our full offering from over 30 providers
Eagle: A very robust, large, low-cost gold project
Victoria Gold (VIT) has released an updated feasibility study (FS) for the Eagle Gold Project in the Yukon, which includes run-of-mine ore from Eagle, higher-grade Olive ore, and accounts for the lower mine construction costs in Canada and the current prices for materials and process reagents. These new inputs have positively influenced operating costs (C1 estimated at US$539/oz, AISC at US$638/oz) and shortened construction from two years to one, while maintaining environmental standards. Fu