• The fifth horizontal well at Carrizales Norte (CNB HZ-6) is producing 1.9 mbbl/d of oil (0.95 mbbl/d net to Arrow) with a water cut of 31%. The well reached TD ~ one month ago.
• After ~1 month of production, CNB HZ-1 and CNB HZ-3 were also producing >30% water with ~1 mbbl/d oil production (gross). Overall current gross oil production from the existing horizontal wells (CNB HZ-1, HZ-3, HZ-4 and HZ-5 but excluding HZ-6) is 4.36 mbbl/d (2.18 mbbl/d net to Arrow) with each well producing 1-1.16 ....
11 Nov 2024
Arrow Exploration Corp. (AIM: AXL): 1.9 mbbl/d at latest CN well. Water disposal infrastructure operational. High net cash.
Sign up to access
Get access to our full offering from over 30 providers
Get access to our full offering from over 30 providers
Arrow Exploration Corp. (AIM: AXL): 1.9 mbbl/d at latest CN well. Water disposal infrastructure operational. High net cash.
Arrow Exploration Corp. (AXL:TSX) | 0 0 0.0%
- Published:
11 Nov 2024 -
Author:
Stephane Foucaud -
Pages:
5
• The fifth horizontal well at Carrizales Norte (CNB HZ-6) is producing 1.9 mbbl/d of oil (0.95 mbbl/d net to Arrow) with a water cut of 31%. The well reached TD ~ one month ago.
• After ~1 month of production, CNB HZ-1 and CNB HZ-3 were also producing >30% water with ~1 mbbl/d oil production (gross). Overall current gross oil production from the existing horizontal wells (CNB HZ-1, HZ-3, HZ-4 and HZ-5 but excluding HZ-6) is 4.36 mbbl/d (2.18 mbbl/d net to Arrow) with each well producing 1-1.16 ....