• Arrow is about to embark on a 10 well drilling programme that could add between 2,800 and 4,800 boe/d net production (before decline and in a success case) to the existing constrained production base of ~1,800 boe/d.
• Over January, production was ~1,800 boe/d with short term outages due to weather at Ombu and Pepper. This compares with production rate of 1,900-2,000 in November which included an initial high contribution at East Pepper (that has since declined, as expected).
• The drilling ....

01 Feb 2023
Arrow Exploration Corp. (AIM: AXL): On track for a very busy 2023

Sign up to access
Get access to our full offering from over 30 providers
Get access to our full offering from over 30 providers
Arrow Exploration Corp. (AIM: AXL): On track for a very busy 2023
Arrow Exploration Corp. (AXL:TSX) | 0 0 0.0%
- Published:
01 Feb 2023 -
Author:
Stephane Foucaud -
Pages:
5 -
• Arrow is about to embark on a 10 well drilling programme that could add between 2,800 and 4,800 boe/d net production (before decline and in a success case) to the existing constrained production base of ~1,800 boe/d.
• Over January, production was ~1,800 boe/d with short term outages due to weather at Ombu and Pepper. This compares with production rate of 1,900-2,000 in November which included an initial high contribution at East Pepper (that has since declined, as expected).
• The drilling ....