Impact: Positive. This processing arrangement and capex acceleration has 2017e volumes moving higher on $20 mm increase in 2016e capex and unchanged 2017e capital program, with Storm benefitting from reduced (15%-20%) operating costs. This is positive to our estimates, likely driving 2017e CFPS +20% higher. With this deal representing 55% of projected Umbach processing footprint come January 2017e, we view this as a bridge in the medium term as Storm works towards a longer term solution (ie.
08 Sep 2016
ANNOUNCES PROCESSING ARRANGEMENT AT UMBACH AND INCREASED 2017 PRODUCTION GUIDANCE
Sign up to access
Get access to our full offering from over 30 providers
Get access to our full offering from over 30 providers
ANNOUNCES PROCESSING ARRANGEMENT AT UMBACH AND INCREASED 2017 PRODUCTION GUIDANCE
- Published:
08 Sep 2016 -
Author:
Robert Fitzmartyn -
Pages:
3
Impact: Positive. This processing arrangement and capex acceleration has 2017e volumes moving higher on $20 mm increase in 2016e capex and unchanged 2017e capital program, with Storm benefitting from reduced (15%-20%) operating costs. This is positive to our estimates, likely driving 2017e CFPS +20% higher. With this deal representing 55% of projected Umbach processing footprint come January 2017e, we view this as a bridge in the medium term as Storm works towards a longer term solution (ie.