Flow rates and pressure at the Yamalik-1 have now stabilised. On November 1, 2018 the well produced 0.5 mmcf/d of gas, 24 bbl/d of condensate, and 269 bbl/d of water through an 18/64” choke with a wellhead pressure of 1,131 psi. The condensate yield has averaged more than 50 bbl/mmcf. The well has recovered c. 80% of the load water injected during fracking.
Sign up to access
Get access to our full offering from over 30 providers
Get access to our full offering from over 30 providers
FLASH: 3Q18 results
Flow rates and pressure at the Yamalik-1 have now stabilised. On November 1, 2018 the well produced 0.5 mmcf/d of gas, 24 bbl/d of condensate, and 269 bbl/d of water through an 18/64” choke with a wellhead pressure of 1,131 psi. The condensate yield has averaged more than 50 bbl/mmcf. The well has recovered c. 80% of the load water injected during fracking.