We are increasingly confident that reliable production at 240 mbbl/d annually is realistic (if there are no government mandated production limits). The main bottlenecks have been the two primary crushers, which have recently been more reliable after design modifications, leading to record production of 206 mbbl/d gross in 2018. The two new crushers under construction will double crushing capacity by year-end. Adding hydrotransport lines to enable the feeding of either of the two primary separ
20 Mar 2019
FLASH: Kearl tour shows clear path to 240 mbbl/d
Sign up to access
Get access to our full offering from over 30 providers
Get access to our full offering from over 30 providers
FLASH: Kearl tour shows clear path to 240 mbbl/d
Imperial Oil Limited (IMO:TSE) | 0 0 (-1.4%) | Mkt Cap: 28,420m
- Published:
20 Mar 2019 -
Author:
Michael P. Dunn -
Pages:
5
We are increasingly confident that reliable production at 240 mbbl/d annually is realistic (if there are no government mandated production limits). The main bottlenecks have been the two primary crushers, which have recently been more reliable after design modifications, leading to record production of 206 mbbl/d gross in 2018. The two new crushers under construction will double crushing capacity by year-end. Adding hydrotransport lines to enable the feeding of either of the two primary separ