Thor Mining recently posted its HY December 2019 report. It was a period of progress across multiple projects. We draw out some of the key highlights below: • A field pump test by EnviroCopper (25%) at Kapunda where metals may be recovered via in-situ recovery (ISR). Confirmatory lab results of the initial positive handheld X-ray fluorescence intersections are due shortly. The program involved drilling three holes, in the southern portion of the deposit, followed by tests to measure conn
24 Mar 2020
Increasing focus on Copper, potential cash in flows from Spring Hill
Sign up to access
Get access to our full offering from over 30 providers
Get access to our full offering from over 30 providers
Increasing focus on Copper, potential cash in flows from Spring Hill
Thor Energy Plc (THR:LON) | 1.2 0 0.0% | Mkt Cap: 3.48m
- Published:
24 Mar 2020 -
Author:
Derren Nathan -
Pages:
8
Thor Mining recently posted its HY December 2019 report. It was a period of progress across multiple projects. We draw out some of the key highlights below: • A field pump test by EnviroCopper (25%) at Kapunda where metals may be recovered via in-situ recovery (ISR). Confirmatory lab results of the initial positive handheld X-ray fluorescence intersections are due shortly. The program involved drilling three holes, in the southern portion of the deposit, followed by tests to measure conn