Preliminary analysis of the Lancaster pilot well confirms a continuous oil column below the basement structural closure. An increase in mid-case estimates of Lancaster oil in place and a higher recovery factor, supported by aquifer drive, could potentially lead to a material increase in recoverable resource estimates. We expect third-party validation of resource upgrades on completion of the 2016 well programme. Ahead of validation, we have increased our estimated early production system (EPS) recoverable volumes to the company’s base-case 53mmbbls and assume full field development P50 recoverable volume of 300mmbo. As a result, our RENAV increases from 41p/share to 73p/share (+78%) based on Edison’s long-term Brent crude price of $70/bbl.
Sign up for free to access
Get access to the latest equity research in real-time from 12 commissioned providers.
Get access to the latest equity research in real-time from 12 commissioned providers.
Confirming oil below structural closure
- Published:
19 Sep 2016 -
Author:
Sanjeev Bahl -
Pages:
6 -
Preliminary analysis of the Lancaster pilot well confirms a continuous oil column below the basement structural closure. An increase in mid-case estimates of Lancaster oil in place and a higher recovery factor, supported by aquifer drive, could potentially lead to a material increase in recoverable resource estimates. We expect third-party validation of resource upgrades on completion of the 2016 well programme. Ahead of validation, we have increased our estimated early production system (EPS) recoverable volumes to the company’s base-case 53mmbbls and assume full field development P50 recoverable volume of 300mmbo. As a result, our RENAV increases from 41p/share to 73p/share (+78%) based on Edison’s long-term Brent crude price of $70/bbl.