i3 Energy announced that it has completed tie-in operations for its two recently drilled Marten Hills wells into the Clearwater Formation (each consisting of 8 horizontal laterals). The 01-12-075-26W4 and 02-12-075-26W4 wells penetrated 13,057m and 12,644m, respectively, of reservoir – both at maximum vertical depths of circa 630m. The wells are now on production and flowing back drilling fluid. This clean-up process is expected to take approximately three to four weeks. The company indicated th ....
29 Jul 2021
i3 Energy (I3E) - Operational Update
Sign up to access
Get access to our full offering from over 30 providers
Get access to our full offering from over 30 providers
i3 Energy (I3E) - Operational Update
i3 Energy Plc (I3E:LON) | 11.1 0 0.2% | Mkt Cap: 133.6m
- Published:
29 Jul 2021 -
Author:
Brendan Long -
Pages:
5
i3 Energy announced that it has completed tie-in operations for its two recently drilled Marten Hills wells into the Clearwater Formation (each consisting of 8 horizontal laterals). The 01-12-075-26W4 and 02-12-075-26W4 wells penetrated 13,057m and 12,644m, respectively, of reservoir – both at maximum vertical depths of circa 630m. The wells are now on production and flowing back drilling fluid. This clean-up process is expected to take approximately three to four weeks. The company indicated th ....