Just a small glitch in a good story
GTU3 is now expected to be tied-in in April 2018 rather than by YE17. In addition, commissioning is expected to be completed within c. 60 days.The delivery of some specially designed valves required for the tie-in of GTU3 with GTU1&2 has been delayed and as a result it will not be possible to bring gas into GTU3 in 2017. Once the tie-in is completed the welding joints need to be hydro-tested prior to any gas passing through it. This testing cannot take place ....
18 Oct 2017
FLASH: Delay at GTU3
Sign up to access
Get access to our full offering from over 30 providers
Get access to our full offering from over 30 providers
FLASH: Delay at GTU3
Nostrum Oil & Gas Plc (NOG:LON) | 5.5 0 0.0% | Mkt Cap: 9.38m
- Published:
18 Oct 2017 -
Author:
Stephane Foucaud -
Pages:
2
Just a small glitch in a good story
GTU3 is now expected to be tied-in in April 2018 rather than by YE17. In addition, commissioning is expected to be completed within c. 60 days.The delivery of some specially designed valves required for the tie-in of GTU3 with GTU1&2 has been delayed and as a result it will not be possible to bring gas into GTU3 in 2017. Once the tie-in is completed the welding joints need to be hydro-tested prior to any gas passing through it. This testing cannot take place ....