Premier has increased its gross resource estimate of the Zama field to 670-810-970 mmboe (P90-P50-P10), following the appraisal campaign. The data has demonstrated reservoir properties at the upper end of expectations, including a higher net-to-gross ratio, better porosity and increased hydrocarbon saturation. This has resulted in a higher estimated oil-in-place and ultimate recovery from the Zama field. Zama-3 has proven the lateral continuity of the reservoir 2.4 km to the south of Zama-1.<
27 Jun 2019
FLASH: Resource upgrade at Zama offshore Mexico
Sign up to access
Get access to our full offering from over 30 providers
Get access to our full offering from over 30 providers
FLASH: Resource upgrade at Zama offshore Mexico
Harbour Energy Plc (HBR:LON) | 273 -3.5 (-0.5%) | Mkt Cap: 2,100m
- Published:
27 Jun 2019 -
Author:
Stephane Foucaud -
Pages:
2
Premier has increased its gross resource estimate of the Zama field to 670-810-970 mmboe (P90-P50-P10), following the appraisal campaign. The data has demonstrated reservoir properties at the upper end of expectations, including a higher net-to-gross ratio, better porosity and increased hydrocarbon saturation. This has resulted in a higher estimated oil-in-place and ultimate recovery from the Zama field. Zama-3 has proven the lateral continuity of the reservoir 2.4 km to the south of Zama-1.<