The Zama 2ST1 encountered 873 feet of gross oil bearing reservoir with a net-to-gross ratio of c. 70%, in line with expectations. The vertical well flowed on test a combined oil rate of 7,426 bbl/d from two separate flow tests over a total perforated interval of 248 feet. The main flow period was for c. 4 days and there was no pressure depletion of the reservoir. As planned, rates were restricted due to limited drawdown to prevent sand production.
16 Apr 2019
FLASH: Well test result in Mexico
Sign up to access
Get access to our full offering from over 30 providers
Get access to our full offering from over 30 providers
FLASH: Well test result in Mexico
Harbour Energy Plc (HBR:LON) | 281 -8.1 (-1.0%) | Mkt Cap: 2,164m
- Published:
16 Apr 2019 -
Author:
Stephane Foucaud -
Pages:
2
The Zama 2ST1 encountered 873 feet of gross oil bearing reservoir with a net-to-gross ratio of c. 70%, in line with expectations. The vertical well flowed on test a combined oil rate of 7,426 bbl/d from two separate flow tests over a total perforated interval of 248 feet. The main flow period was for c. 4 days and there was no pressure depletion of the reservoir. As planned, rates were restricted due to limited drawdown to prevent sand production.