End 1Q18 cash was c. US$29mm mm (GMP FEe: c. US$26 mm) with no debt. Overall 1Q18 production was c. 3.0 mboe/d (GMP FEe: 3.6 mboe/d). 1.8 mboe/d was from NW Gemsa in Egypt (GMP FEe: 2.1 mboe/d). 558 bbl/d was from Meseda in Egypt (GMP FEe: 660 bbl/d). 664 boe/d was from Morocco (GMP FEe: 750 boe/d).
17 May 2018
FLASH: 1Q18 results
Sign up to access
Get access to our full offering from over 30 providers
Get access to our full offering from over 30 providers
FLASH: 1Q18 results
SDX Energy PLC (SDX:LON) | 3.6 0 0.0% | Mkt Cap: 7.26m
- Published:
17 May 2018 -
Author:
Stephane Foucaud -
Pages:
2
End 1Q18 cash was c. US$29mm mm (GMP FEe: c. US$26 mm) with no debt. Overall 1Q18 production was c. 3.0 mboe/d (GMP FEe: 3.6 mboe/d). 1.8 mboe/d was from NW Gemsa in Egypt (GMP FEe: 2.1 mboe/d). 558 bbl/d was from Meseda in Egypt (GMP FEe: 660 bbl/d). 664 boe/d was from Morocco (GMP FEe: 750 boe/d).