Gas has started producing from SDX’s South Disouq concession (55% WI, op) in Egypt. It has been flowing through the South Disouq Central Processing Facility (CPF) since 7th November 2019. Each of the four discovery wells have been hooked up to the CPF and tested since then and have produced at their expected rates of 8 mmcf/d to 15 mmcf/d. Over the last three days, the CPF has been operating in line with company expectations, achieving average gross production of 23 mmcf/d of gas (G
12 Nov 2019
FLASH: First gas at South Disouq in Egypt & permanent CEO
Sign up to access
Get access to our full offering from over 30 providers
Get access to our full offering from over 30 providers
FLASH: First gas at South Disouq in Egypt & permanent CEO
SDX Energy PLC (SDX:LON) | 3.6 0 0.0% | Mkt Cap: 7.47m
- Published:
12 Nov 2019 -
Author:
Taro Kiley -
Pages:
2
Gas has started producing from SDX’s South Disouq concession (55% WI, op) in Egypt. It has been flowing through the South Disouq Central Processing Facility (CPF) since 7th November 2019. Each of the four discovery wells have been hooked up to the CPF and tested since then and have produced at their expected rates of 8 mmcf/d to 15 mmcf/d. Over the last three days, the CPF has been operating in line with company expectations, achieving average gross production of 23 mmcf/d of gas (G