2Q19 WI production was 48 mboe/d (GMP FEe: 47.1 mboe/d) with downtime of 12% (GMP FEe: 15%). Net cash at the end of June was US$83 mm (GMP FEe: US$96 mm).
30 Jul 2019
FLASH: 2Q19 results
Sign up to access
Get access to our full offering from over 30 providers
Get access to our full offering from over 30 providers
FLASH: 2Q19 results
Seplat Energy PLC (SEPL:LON) | 145 0 0.0% | Mkt Cap: 850.8m
- Published:
30 Jul 2019 -
Author:
Stephane Foucaud -
Pages:
2
2Q19 WI production was 48 mboe/d (GMP FEe: 47.1 mboe/d) with downtime of 12% (GMP FEe: 15%). Net cash at the end of June was US$83 mm (GMP FEe: US$96 mm).