1Q19 production was 46,581 boe/d (GMP FEe: 52.1 mboe/d) with downtime of 15% (GMP FEe: 15% at OML 4, 38 and 41). Production losses are yet to be finalised but are expected to remain at levels consistent with prior periods. The company reiterated its FY19 production guidance of 49-55 mboe/d (GMP FEe: 52.9 mboe/d) with US$200 mm capex (Excluding ANOH). The link to Escravos continues to be expected to be operational in 2Q19. First gas at ANOH is expected in 1Q21 with a phase 1, 300 mmcf/d gas pr
30 Apr 2019
FLASH: Further progress at ANOH
Sign up to access
Get access to our full offering from over 30 providers
Get access to our full offering from over 30 providers
FLASH: Further progress at ANOH
Seplat Energy PLC (SEPL:LON) | 146 0.7 0.3% | Mkt Cap: 857.5m
- Published:
30 Apr 2019 -
Author:
Stephane Foucaud -
Pages:
2
1Q19 production was 46,581 boe/d (GMP FEe: 52.1 mboe/d) with downtime of 15% (GMP FEe: 15% at OML 4, 38 and 41). Production losses are yet to be finalised but are expected to remain at levels consistent with prior periods. The company reiterated its FY19 production guidance of 49-55 mboe/d (GMP FEe: 52.9 mboe/d) with US$200 mm capex (Excluding ANOH). The link to Escravos continues to be expected to be operational in 2Q19. First gas at ANOH is expected in 1Q21 with a phase 1, 300 mmcf/d gas pr