3Q19 production was 15,943 boe/d including 13,750 boe/d in line with previous indications. Production to date in October averaged approximately 15,206 boe/d including 13,228 boe/d in Egypt. 2019 production guidance is now expected to range from 15.5 to 16.0 mboe/d (GMP FEe: 16.1 mboe/d), up from 15.0-16.0 mboe/d.
Sign up to access
Get access to our full offering from over 30 providers
Get access to our full offering from over 30 providers
FLASH: FY19 production guidance at the higher end of the range
- Published:
30 Oct 2019 -
Author:
Stephane Foucaud -
Pages:
2
3Q19 production was 15,943 boe/d including 13,750 boe/d in line with previous indications. Production to date in October averaged approximately 15,206 boe/d including 13,228 boe/d in Egypt. 2019 production guidance is now expected to range from 15.5 to 16.0 mboe/d (GMP FEe: 16.1 mboe/d), up from 15.0-16.0 mboe/d.