Hurricane has announced an update on the strong ongoing performance of the Lancaster early production system (EPS), with recent individual well tests supporting guidance of 20,000bod for FY20 (before operational downtime). It has also been granted a five-year extension to its P1368 licence, covering Lancaster and Lincoln, resulting in changes to its 2020 work programme. One or more sub-vertical wells will be drilled on both Lincoln (in 2020) and Lancaster (in 2021) to determine the maximum ve
16 Dec 2019
Hurricane Energy - Strong Lancaster EPS performance
Sign up to access
Get access to our full offering from over 30 providers
Get access to our full offering from over 30 providers
Hurricane Energy - Strong Lancaster EPS performance
- Published:
16 Dec 2019 - Author:
-
Pages:
2
Hurricane has announced an update on the strong ongoing performance of the Lancaster early production system (EPS), with recent individual well tests supporting guidance of 20,000bod for FY20 (before operational downtime). It has also been granted a five-year extension to its P1368 licence, covering Lancaster and Lincoln, resulting in changes to its 2020 work programme. One or more sub-vertical wells will be drilled on both Lincoln (in 2020) and Lancaster (in 2021) to determine the maximum ve