• 3Q22 production was in line with expectations and within management’s guidance. Production at South Disouq is holding up well.
• In Morocco, production in 4Q22 is expected to benefit both from the recently drilled KSR-1 and SAK-1 wells being tied-in and workovers on existing wells.
• At West Gharib, the MSD-28 and MSD-22 wells that were drilled in October will add to 4Q22 production.
• The Rabul Deep-1 exploration well did not encounter hydrocarbons and is likely to be completed as a water in ....
18 Nov 2022
SDX Energy (AIM: SDX): Putting the building blocks in place
Sign up to access
Get access to our full offering from over 30 providers
Get access to our full offering from over 30 providers
SDX Energy (AIM: SDX): Putting the building blocks in place
SDX Energy PLC (SDX:LON) | 3.6 0 0.0% | Mkt Cap: 7.47m
- Published:
18 Nov 2022 -
Author:
Stephane Foucaud -
Pages:
5
• 3Q22 production was in line with expectations and within management’s guidance. Production at South Disouq is holding up well.
• In Morocco, production in 4Q22 is expected to benefit both from the recently drilled KSR-1 and SAK-1 wells being tied-in and workovers on existing wells.
• At West Gharib, the MSD-28 and MSD-22 wells that were drilled in October will add to 4Q22 production.
• The Rabul Deep-1 exploration well did not encounter hydrocarbons and is likely to be completed as a water in ....