Oriole Resources PLC's (LON:ORR) Tim Livesey catches up with Proactive London on releasing further results from the recently completed 3,118 metre maiden diamond drilling programme at its 51%-owned Bibemi gold project in Cameroon.
The results are from the 5.3km-long Bakassi Zone 1 prospect, and include best intersections of 2.45 metres grading 2.96 grammes per tonnes, 3.6 metres grading 1.75 grammes and 12.4 metres grading 0.71 grammes.
Livesey says this is 'very significant because the area has never been drilled...we've kicked off the first program here'.