• Kosmos Energy and BW Energy had already reported 1Q21 production in EG and Gabon. 1Q21 gross production in Tunisia of 4,543 bbl/d was in line with our forecasts.
• FY21 WI production guidance is around 9 mbbl/d, which is in line with our expectations. Production in Tunisia is expected to be stable at current levels.
• 2021 is a very important year for the Ceiba Okume asset in EG with the first drilling campaign since 2015. The focus of the past six years has been on water injection and produc ....
27 May 2021
Panoro Energy ASA (OSE: PEN): First drilling campaign at Ceiba Okume since 2015
Sign up to access
Get access to our full offering from over 30 providers
Get access to our full offering from over 30 providers
Panoro Energy ASA (OSE: PEN): First drilling campaign at Ceiba Okume since 2015
- Published:
27 May 2021 -
Author:
Stephane Foucaud -
Pages:
5
• Kosmos Energy and BW Energy had already reported 1Q21 production in EG and Gabon. 1Q21 gross production in Tunisia of 4,543 bbl/d was in line with our forecasts.
• FY21 WI production guidance is around 9 mbbl/d, which is in line with our expectations. Production in Tunisia is expected to be stable at current levels.
• 2021 is a very important year for the Ceiba Okume asset in EG with the first drilling campaign since 2015. The focus of the past six years has been on water injection and produc ....