Arras Minerals (“Arras”) has released three results from across the Elemes project, including 246.2m at 1.02% CuEq from just 0.8m depth. This intercept from hole EL25023 was in the Berezski North system where previous drilling includes 547m @ 0.70% CuEq from 14m (EL24005), and 276m @ 0.58% CuEq from surface (EL25016). The broad intersections, strong grade profile, and mineralisation from near surface increases the likelihood of bringing this material into a resource, in our view. The interpreted ....
13 Jan 2026
Arras Minerals: Berezski North drilling hits 246m @ 1.02% CuEq, defining further continuity and scale at Elemes Project
Sign up to access
Get access to our full offering from over 100 providers
Get access to our full offering from over 100 providers
Arras Minerals: Berezski North drilling hits 246m @ 1.02% CuEq, defining further continuity and scale at Elemes Project
Arras Minerals (“Arras”) has released three results from across the Elemes project, including 246.2m at 1.02% CuEq from just 0.8m depth. This intercept from hole EL25023 was in the Berezski North system where previous drilling includes 547m @ 0.70% CuEq from 14m (EL24005), and 276m @ 0.58% CuEq from surface (EL25016). The broad intersections, strong grade profile, and mineralisation from near surface increases the likelihood of bringing this material into a resource, in our view. The interpreted ....