• The Hercules drilling rig is expected to reach Walvis Bay around 4 November and reach the first drilling location at PEL83 (operated by Galp) by mid November.
• On completing the first well the rig will then move to the second drilling location – if results merit, the second location may be drill stem tested.
• The drilling programme is targeting the Mopane complex located at the southern end of PEL83 with an estimated mean oil in place up to 10 bnbbl.
• Assuming 30% recovery factor, this impl ....

20 Oct 2023
Sintana Energy Inc. (TSX-V: SEI): First high impact well to spud mid November

Sign up to access
Get access to our full offering from over 30 providers
Get access to our full offering from over 30 providers
Sintana Energy Inc. (TSX-V: SEI): First high impact well to spud mid November
• The Hercules drilling rig is expected to reach Walvis Bay around 4 November and reach the first drilling location at PEL83 (operated by Galp) by mid November.
• On completing the first well the rig will then move to the second drilling location – if results merit, the second location may be drill stem tested.
• The drilling programme is targeting the Mopane complex located at the southern end of PEL83 with an estimated mean oil in place up to 10 bnbbl.
• Assuming 30% recovery factor, this impl ....