Capital Metals (“CMET”) released an updated Mineral Resource Estimate (“MRE”) for the Initial Mining Area (“IMA”) at its Taprobane mineral sands project in Sri Lanka. The IMA Resource has increased to 13.1Mt at a 5.5% heavy mineral (“HM”) grade using a 2% cut-off grade from 897kt at 17.9% using a 5% cut-off in the 2016 MRE, representing a 4.5x uplift in contained HM. Without lowering the cut-off, the contained HM would still have increased 2.8x (with 4.3Mt at 10.5%). This update is only focused ....
18 Nov 2025
Capital Metals: MRE update for the proposed Initial Mining Area positions Taprobane as scalable, long-life project
Sign up to access
Get access to our full offering from over 100 providers
Get access to our full offering from over 100 providers
Capital Metals: MRE update for the proposed Initial Mining Area positions Taprobane as scalable, long-life project
Capital Metals plc (CMET:LON) | 5.3 0 (-4.5%) | Mkt Cap: 26.1m
- Published:
18 Nov 2025 -
Author:
Roger Bell -
Pages:
3 -
Capital Metals (“CMET”) released an updated Mineral Resource Estimate (“MRE”) for the Initial Mining Area (“IMA”) at its Taprobane mineral sands project in Sri Lanka. The IMA Resource has increased to 13.1Mt at a 5.5% heavy mineral (“HM”) grade using a 2% cut-off grade from 897kt at 17.9% using a 5% cut-off in the 2016 MRE, representing a 4.5x uplift in contained HM. Without lowering the cut-off, the contained HM would still have increased 2.8x (with 4.3Mt at 10.5%). This update is only focused ....