This morning Anglesey Mining provides details of metallurgical test work carried out on a 340kg mixed parcel of White rock and Engine mineralisation – these being the mix of zones expected in the first few years of production at its Parys Mountain zinc-lead-copper VMS deposit in North Wales. The material tested a head grade of 0.4% copper, 3.6% zinc, 3.1% lead, 49g/t silver and 0.7% gold (7.5% zinc equivalent on a base metal-only basis)
04 Dec 2023
Anglesey Mining - Positive preliminary results from metallurgical testwork
Sign up to access
Get access to our full offering from over 30 providers
Get access to our full offering from over 30 providers
Anglesey Mining - Positive preliminary results from metallurgical testwork
Anglesey Mining plc (AYM:LON) | 1.4 0 0.0% | Mkt Cap: 5.88m
- Published:
04 Dec 2023 -
Author:
Paul Smith | David Seers -
Pages:
4
This morning Anglesey Mining provides details of metallurgical test work carried out on a 340kg mixed parcel of White rock and Engine mineralisation – these being the mix of zones expected in the first few years of production at its Parys Mountain zinc-lead-copper VMS deposit in North Wales. The material tested a head grade of 0.4% copper, 3.6% zinc, 3.1% lead, 49g/t silver and 0.7% gold (7.5% zinc equivalent on a base metal-only basis)