Faroe held an analyst trip on 18th and 19th of October in Norway. The Company unveiled production addition (+3.5-5.5 mboe/d) at Tambar well beyond our expectations. While the most likely tie-back development concept at Pil means that the field net production plateau is just 7 mboe/d versus 13.5 mboe/d previously, Brasse and Njord are expected to contribute 16 mboe/d by 2021; which is well above our expectations. Overall, we believe that the company’s existing assets could comfortably support c.4 .... 
                                                            
                                                
                    21 Oct 2016 
Unveiling details on growth plans
    Sign up to access
Get access to our full offering from over 100 providers
Get access to our full offering from over 100 providers
Unveiling details on growth plans
Faroe Petroleum (FPM:LON) | 0 0 (-0.4%) | Mkt Cap: 371.0m
- Published: 
21 Oct 2016  - 
                                            
                                            
                                            Author:
                                                
Stephane Foucaud  - 
                                            
                                            Pages:
                                                
10  - 
                                            
                                         
                                                                Faroe held an analyst trip on 18th and 19th of October in Norway. The Company unveiled production addition (+3.5-5.5 mboe/d) at Tambar well beyond our expectations. While the most likely tie-back development concept at Pil means that the field net production plateau is just 7 mboe/d versus 13.5 mboe/d previously, Brasse and Njord are expected to contribute 16 mboe/d by 2021; which is well above our expectations. Overall, we believe that the company’s existing assets could comfortably support c.4 ....