Production for the first 9 months of 2019 was 3.5 mboe/d (GMP FEe: 3.6 mboe/d). NW Gemsa was 1.9 mboe/d (GMP FEe: 2.1 mboe/d), Meseda was 814 bbl/d (GMP FEe: 802 bbl/d) and Morocco was 772boe/d (GMP FEe: 754 boe/d). South Disouq achieved first gas on 7th November as previously announced.
22 Nov 2019
FLASH: 3Q19 results
Sign up to access
Get access to our full offering from over 30 providers
Get access to our full offering from over 30 providers
FLASH: 3Q19 results
SDX Energy PLC (SDX:LON) | 3.6 0 0.0% | Mkt Cap: 7.36m
- Published:
22 Nov 2019 -
Author:
Taro Kiley -
Pages:
2
Production for the first 9 months of 2019 was 3.5 mboe/d (GMP FEe: 3.6 mboe/d). NW Gemsa was 1.9 mboe/d (GMP FEe: 2.1 mboe/d), Meseda was 814 bbl/d (GMP FEe: 802 bbl/d) and Morocco was 772boe/d (GMP FEe: 754 boe/d). South Disouq achieved first gas on 7th November as previously announced.