The third well test at Inanli-1 yielded an average combined flow rate of 0.44 mmcf/d over 10 days from two distinct intervals with an aggregate 26 m net sands. The combined flow rate was 0.25 mmcf/d over the final 24 hours. The production rate is relatively stable at these levels. The condensate gas ratio was 30 bbl/mmcf which is much higher than the deeper zones. A total of 130 tonnes of proppant was injected and over the final 24 hours, water production had declined to 130 bbl/d with the we
26 Sep 2019
FLASH: Third well test results at Inanli
Sign up to access
Get access to our full offering from over 30 providers
Get access to our full offering from over 30 providers
FLASH: Third well test results at Inanli
The third well test at Inanli-1 yielded an average combined flow rate of 0.44 mmcf/d over 10 days from two distinct intervals with an aggregate 26 m net sands. The combined flow rate was 0.25 mmcf/d over the final 24 hours. The production rate is relatively stable at these levels. The condensate gas ratio was 30 bbl/mmcf which is much higher than the deeper zones. A total of 130 tonnes of proppant was injected and over the final 24 hours, water production had declined to 130 bbl/d with the we