• 2Q24 production was 35,608 boe/d, which is in line with 2Q24 but below April production of ~37.5 mboe/d, as the company has experienced sporadic blockades and weather-associated flooding at Llanos 34. As a result production in Colombia was only 33,956 boe/d (we forecasted 35.5 mboe/d). The waterflood programme now generates 3.7 mbbl/d.
• GeoPark’s new Argentinian asset is performing very well with current WI production of 5.7 mboe/d with the Mata Mora Norte 2223 well producing 2,136 boe/d gros ....

23 Jul 2024
GeoPark Limited (NYSE: GPRK): Strong performance in Argentina

Sign up to access
Get access to our full offering from over 30 providers
Get access to our full offering from over 30 providers
GeoPark Limited (NYSE: GPRK): Strong performance in Argentina
• 2Q24 production was 35,608 boe/d, which is in line with 2Q24 but below April production of ~37.5 mboe/d, as the company has experienced sporadic blockades and weather-associated flooding at Llanos 34. As a result production in Colombia was only 33,956 boe/d (we forecasted 35.5 mboe/d). The waterflood programme now generates 3.7 mbbl/d.
• GeoPark’s new Argentinian asset is performing very well with current WI production of 5.7 mboe/d with the Mata Mora Norte 2223 well producing 2,136 boe/d gros ....