• Monumental Energy will fund New Zealand Energy’s (NZE) share of work‑over costs at Waihapa‑Ngaere on Petroleum Mining Licences PML 38140 and PML 3814, in exchange for a royalty on incremental production.
• The programme is expected to include the reperforations of Ngaere‑1 and Ngaere‑2 and repairs to the Waihapa H1 well, with an estimated total cost of C$0.7–0.8 mm. These activities could add approximately 200–260 bbl/d of gross production.
• NZE holds a 50% working interest, but will remit 75 ....
15 Jan 2026
New Zealand Energy Corp. (TSX-V: NZ): Gas storage MOU signed with Genesis Energy
Sign up to access
Get access to our full offering from over 100 providers
Get access to our full offering from over 100 providers
New Zealand Energy Corp. (TSX-V: NZ): Gas storage MOU signed with Genesis Energy
- Published:
15 Jan 2026 -
Author:
Stephane Foucaud -
Pages:
5 -
• Monumental Energy will fund New Zealand Energy’s (NZE) share of work‑over costs at Waihapa‑Ngaere on Petroleum Mining Licences PML 38140 and PML 3814, in exchange for a royalty on incremental production.
• The programme is expected to include the reperforations of Ngaere‑1 and Ngaere‑2 and repairs to the Waihapa H1 well, with an estimated total cost of C$0.7–0.8 mm. These activities could add approximately 200–260 bbl/d of gross production.
• NZE holds a 50% working interest, but will remit 75 ....