• Monumental Energy reports that Copper Moki-1 and Copper Moki-2 are currently producing a combined 125 bbl/d, with rates trending upwards as pump speeds are gradually increased. Reflecting this momentum, we are revising our gross production estimate for Copper Moki from 125 boe/d to 180 boe/d (~175 bbl/d) for Q4 2025.
• The Ngaere-1 pipeline was recommissioned in July with initial production from the well exceeding 400 bbl/d (200 bbl/d net to New Zealand Energy’s 50% working interest). Producti ....

20 Aug 2025
New Zealand Energy Corp. (TSX-V: NZ): Higher than expected production resumption

Sign up to access
Get access to our full offering from over 30 providers
Get access to our full offering from over 30 providers
New Zealand Energy Corp. (TSX-V: NZ): Higher than expected production resumption
- Published:
20 Aug 2025 -
Author:
Stephane Foucaud -
Pages:
5 -
• Monumental Energy reports that Copper Moki-1 and Copper Moki-2 are currently producing a combined 125 bbl/d, with rates trending upwards as pump speeds are gradually increased. Reflecting this momentum, we are revising our gross production estimate for Copper Moki from 125 boe/d to 180 boe/d (~175 bbl/d) for Q4 2025.
• The Ngaere-1 pipeline was recommissioned in July with initial production from the well exceeding 400 bbl/d (200 bbl/d net to New Zealand Energy’s 50% working interest). Producti ....