• 1Q25 production of ~12 mbbl/d and net debt at the end of March had been previously disclosed.
• The company has reaffirmed its FY25 production guidance of 11–13 mbbl/d but has raised its expected capex for 2025 from US$35 mm to US$40 mm. This increase reflects additional spending to appraise the Bourdon discovery.
• Panoro has initiated an audit of 112 mmboe WI 2C resources on Block EG-23, offshore Equatorial Guinea, in 50–100 metres of water depth. Some of these resources, estimated by the M ....

21 May 2025
Panoro Energy ASA (OSE: PEN): Potential resources addition in EG, reducing costs in Gabon

Sign up to access
Get access to our full offering from over 30 providers
Get access to our full offering from over 30 providers
Panoro Energy ASA (OSE: PEN): Potential resources addition in EG, reducing costs in Gabon
- Published:
21 May 2025 -
Author:
Stephane Foucaud -
Pages:
5 -
• 1Q25 production of ~12 mbbl/d and net debt at the end of March had been previously disclosed.
• The company has reaffirmed its FY25 production guidance of 11–13 mbbl/d but has raised its expected capex for 2025 from US$35 mm to US$40 mm. This increase reflects additional spending to appraise the Bourdon discovery.
• Panoro has initiated an audit of 112 mmboe WI 2C resources on Block EG-23, offshore Equatorial Guinea, in 50–100 metres of water depth. Some of these resources, estimated by the M ....