◆ Built, operating underground gold mine; re-rating is now execution-driven:
Lion One Metals Limited (TSXV: “LIO”, OTCQX: LOMLF) or (the “Company”)
owns 100% of the Tuvatu Gold Mine in Fiji, with underground access, a processing
plant, and filtered tailings infrastructure constructed and operating.
Recent operating results demonstrate production of ~14.7 koz over FY25,
an average throughput of 336 tpd, and recoveries of ~81%. With construction
and commissioning complete, the investment debate has shifted from
development risk to operational consistency across development metres,
stoping, throughput, recoveries, and unit costs.
02 Feb 2026
Lion One Metals (TSXV: LIO) Initiating with buy. High-grade underground producer in ramp-up with district-scale optionality
Sign up for free to access
Get access to the latest equity research in real-time from 12 commissioned providers.
Get access to the latest equity research in real-time from 12 commissioned providers.
Lion One Metals (TSXV: LIO) Initiating with buy. High-grade underground producer in ramp-up with district-scale optionality
- Published:
02 Feb 2026 -
Author:
Sehaj Anand -
Pages:
43 -
◆ Built, operating underground gold mine; re-rating is now execution-driven:
Lion One Metals Limited (TSXV: “LIO”, OTCQX: LOMLF) or (the “Company”)
owns 100% of the Tuvatu Gold Mine in Fiji, with underground access, a processing
plant, and filtered tailings infrastructure constructed and operating.
Recent operating results demonstrate production of ~14.7 koz over FY25,
an average throughput of 336 tpd, and recoveries of ~81%. With construction
and commissioning complete, the investment debate has shifted from
development risk to operational consistency across development metres,
stoping, throughput, recoveries, and unit costs.