Kenmare Resources (“KMR”) has provided an update on the Wet Concentrator Plant A (“WCP A”) upgrade at the Moma mine in Mozambique. Two new higher-capacity dredges and a new feed preparation module are being connected to WCP A, a process which is expected to take 3-4 weeks. The feed preparation module also includes an upfront desliming circuit, required to handle the higher levels of slimes in the Nataka zone. Nataka accounts for 70% of the Mineral Resource at Moma and will support KMR’s producti ....

12 Sep 2025
Kenmare Resources: New dredges successfully floated with WCP A to hit full nameplate capacity at Namalope by year end

Sign up to access
Get access to our full offering from over 30 providers
Get access to our full offering from over 30 providers
Kenmare Resources: New dredges successfully floated with WCP A to hit full nameplate capacity at Namalope by year end
Kenmare Resources Plc (KMR:LON) | 306 7.6 0.8% | Mkt Cap: 272.8m
- Published:
12 Sep 2025 -
Author:
Roger Bell -
Pages:
3 -
Kenmare Resources (“KMR”) has provided an update on the Wet Concentrator Plant A (“WCP A”) upgrade at the Moma mine in Mozambique. Two new higher-capacity dredges and a new feed preparation module are being connected to WCP A, a process which is expected to take 3-4 weeks. The feed preparation module also includes an upfront desliming circuit, required to handle the higher levels of slimes in the Nataka zone. Nataka accounts for 70% of the Mineral Resource at Moma and will support KMR’s producti ....