Kenmare Resources (“KMR”) has released its Q1’26 production update, with bottlenecks at Wet Concentrator Plant A (“WCP A”) continuing to limit operations at the Moma mine in Mozambique. Heavy mineral concentrate (“HMC”) output fell 30% YoY to 217kt, reflecting lower mined grades of 3.26% (-23% YoY) and ore excavated of 8Mt (-14% YoY). Average grades are expected to decline in 2026, driven by WCP A’s transition to Nataka and curtailment of dry mining operations. At the Mineral Separation Plant (“ ....
22 Apr 2026
Kenmare Resources: Quarterly production constrained by bottlenecks at WCP A; FY26 guidance maintained
Sign up to access
Get access to our full offering from over 100 providers
Get access to our full offering from over 100 providers
Kenmare Resources: Quarterly production constrained by bottlenecks at WCP A; FY26 guidance maintained
Kenmare Resources Plc (KMR:LON) | 222 0 0.0% | Mkt Cap: 197.9m
- Published:
22 Apr 2026 -
Author:
Roger Bell -
Pages:
3 -
Kenmare Resources (“KMR”) has released its Q1’26 production update, with bottlenecks at Wet Concentrator Plant A (“WCP A”) continuing to limit operations at the Moma mine in Mozambique. Heavy mineral concentrate (“HMC”) output fell 30% YoY to 217kt, reflecting lower mined grades of 3.26% (-23% YoY) and ore excavated of 8Mt (-14% YoY). Average grades are expected to decline in 2026, driven by WCP A’s transition to Nataka and curtailment of dry mining operations. At the Mineral Separation Plant (“ ....