Maurel & Prom (“M&P”) delivered a stronger‑than‑expected H1 2025, with production (ex-Venezuela) averaging 29.6kboe/d, up 4 % versus H2’24. Tanzanian gas production rebounded 9% (9.7kboe/d) and Angola production jumped 8 % (4.3kboe/d) more than offsetting a 1% dip at Ezanga (15.5kboe/d). Venezuela contributed 8.2kboe/d (+18% h/h) until the late‑May OFAC licence expiry. Valued production (i.e. sales based on production) was US$261mm, falling in line with the 8% drop in the realised oil price to U ....

17 Jul 2025
Maurel et Prom: H1’25 results - Strong FCF generation supported by a growing gas portfolio

Sign up to access
Get access to our full offering from over 30 providers
Get access to our full offering from over 30 providers
Maurel et Prom: H1’25 results - Strong FCF generation supported by a growing gas portfolio
- Published:
17 Jul 2025 -
Author:
Anish Kapadia -
Pages:
6 -
Maurel & Prom (“M&P”) delivered a stronger‑than‑expected H1 2025, with production (ex-Venezuela) averaging 29.6kboe/d, up 4 % versus H2’24. Tanzanian gas production rebounded 9% (9.7kboe/d) and Angola production jumped 8 % (4.3kboe/d) more than offsetting a 1% dip at Ezanga (15.5kboe/d). Venezuela contributed 8.2kboe/d (+18% h/h) until the late‑May OFAC licence expiry. Valued production (i.e. sales based on production) was US$261mm, falling in line with the 8% drop in the realised oil price to U ....