SDX Energy has announced the initial results of the testing at the SD-1X gas discovery in the South Disouq licence where it has a 55% operated working interest. The initial test produced a flow rate of dry gas of 25.8 mmcf/day which was ahead of management expectations of approximately 15 mmcf/day. This flow rate was limited by the surface equipment. The well has now been shut in for initial build up and then will be flow tested at several additional flow rates and fluid samples taken in orde
31 May 2017
Confirmation of significant discovery
Sign up to access
Get access to our full offering from over 30 providers
Get access to our full offering from over 30 providers
Confirmation of significant discovery
SDX Energy PLC (SDX:LON) | 3.6 0 0.0% | Mkt Cap: 7.26m
- Published:
31 May 2017 -
Author:
Peter Hitchens -
Pages:
4
SDX Energy has announced the initial results of the testing at the SD-1X gas discovery in the South Disouq licence where it has a 55% operated working interest. The initial test produced a flow rate of dry gas of 25.8 mmcf/day which was ahead of management expectations of approximately 15 mmcf/day. This flow rate was limited by the surface equipment. The well has now been shut in for initial build up and then will be flow tested at several additional flow rates and fluid samples taken in orde