The Coho-1 well flowed 17.5 mmcf/d on test on average during the final flow back period. The peak rate of 19.8 mmcf/d of dry, sweet natural gas was observed with a wellhead pressure of 2,632 psi on a 32/64" choke. Given the higher than expected initial test rates and due to equipment limitations and concerns regarding the environmental impact of the test flare, the company chose to shorten the flowback period and to conduct the balance of the testing at restricted drawdowns.
18 Nov 2019
FLASH: 17.5 mmcf/d flow rate at Coho-1
Sign up to access
Get access to our full offering from over 30 providers
Get access to our full offering from over 30 providers
FLASH: 17.5 mmcf/d flow rate at Coho-1
Touchstone Exploration Inc (TXP:LON) | 50.5 0 0.0% | Mkt Cap: 118.3m
- Published:
18 Nov 2019 -
Author:
Taro Kiley -
Pages:
2
The Coho-1 well flowed 17.5 mmcf/d on test on average during the final flow back period. The peak rate of 19.8 mmcf/d of dry, sweet natural gas was observed with a wellhead pressure of 2,632 psi on a 32/64" choke. Given the higher than expected initial test rates and due to equipment limitations and concerns regarding the environmental impact of the test flare, the company chose to shorten the flowback period and to conduct the balance of the testing at restricted drawdowns.