• The Indico 6 and Indico 7 wells in the CPO-5 block in Colombia are now back online. Each well is expected to reach 4,000 bbl/d gross production (8,000 bbl/d gross total, 2,400 bbl/d net to GeoPark). The total gross production of both wells could reach 9,000 bbl/d by YE23.
• The Toritos 1 exploration well at LL-123 encountered hydrocarbons in the Guadalupe and Gacheta formations and is now on production at a rate of ~1.4 mbbl/d with 1% water cut. The Saltador 1 well at LL-123 is on production a ....

05 Oct 2023
GeoPark Limited (NYSE: GPRK): CPO-5 wells back online. Multiple discoveries in Colombia and Ecuador

Sign up to access
Get access to our full offering from over 30 providers
Get access to our full offering from over 30 providers
GeoPark Limited (NYSE: GPRK): CPO-5 wells back online. Multiple discoveries in Colombia and Ecuador
- Published:
05 Oct 2023 -
Author:
Stephane Foucaud -
Pages:
5 -
• The Indico 6 and Indico 7 wells in the CPO-5 block in Colombia are now back online. Each well is expected to reach 4,000 bbl/d gross production (8,000 bbl/d gross total, 2,400 bbl/d net to GeoPark). The total gross production of both wells could reach 9,000 bbl/d by YE23.
• The Toritos 1 exploration well at LL-123 encountered hydrocarbons in the Guadalupe and Gacheta formations and is now on production at a rate of ~1.4 mbbl/d with 1% water cut. The Saltador 1 well at LL-123 is on production a ....