
11 Jun 2021
Auctus on Friday - 11/06/2021
Exxon Mobil Corporation (XOM:NYS), 0 | Serica Energy PLC (SQZ:LON), 161 | Jadestone Energy PLC (JSE:LON), 21.0 | Frontera Energy Corporation (FEC:TSE), 0 | Equinor ASA (EQNR:OSL), 0 | Capricorn Energy PLC (CNE:LON), 225 | 88 Energy Limited (88E:ASX), 0 | Panoro Energy ASA (PEN:OSL), 0 | GeoPark Ltd (GPRK:NYS), 0 | Equinor ASA (0M2Z:LON), 0 | Exxon Mobil Corporation (0R1M:LON), 10,200 | GeoPark Ltd (0MDP:LON), 0 | Maha Energy AB Class A (0GEA:LON), 0 | Pennant International Group plc (PEN:LON), 27.5 | Calima Energy Ltd (CLMEF:OTC), 0
AUCTUS PUBLICATIONS
________________________________________
Calima Energy (CE1 AU)C; Target of A$0.035 per share: Increasing investment and production outlook - Production at the end of May was 3,100 boe/d with a further eight wells expected on stream by YE21. This level of production is above forecast and reflects the strong performance of the drilling at Brooks. Calima is increasing its capex programme from C$17 mm to C$20 mm with two new wells being added to the FY21 drilling programme (exc ....

Sign up to access
Get access to our full offering from over 30 providers
Get access to our full offering from over 30 providers
Auctus on Friday - 11/06/2021
Exxon Mobil Corporation (XOM:NYS), 0 | Serica Energy PLC (SQZ:LON), 161 | Jadestone Energy PLC (JSE:LON), 21.0 | Frontera Energy Corporation (FEC:TSE), 0 | Equinor ASA (EQNR:OSL), 0 | Capricorn Energy PLC (CNE:LON), 225 | 88 Energy Limited (88E:ASX), 0 | Panoro Energy ASA (PEN:OSL), 0 | GeoPark Ltd (GPRK:NYS), 0 | Equinor ASA (0M2Z:LON), 0 | Exxon Mobil Corporation (0R1M:LON), 10,200 | GeoPark Ltd (0MDP:LON), 0 | Maha Energy AB Class A (0GEA:LON), 0 | Pennant International Group plc (PEN:LON), 27.5 | Calima Energy Ltd (CLMEF:OTC), 0
- Published:
11 Jun 2021 -
Author:
Stephane Foucaud -
Pages:
7 -
AUCTUS PUBLICATIONS
________________________________________
Calima Energy (CE1 AU)C; Target of A$0.035 per share: Increasing investment and production outlook - Production at the end of May was 3,100 boe/d with a further eight wells expected on stream by YE21. This level of production is above forecast and reflects the strong performance of the drilling at Brooks. Calima is increasing its capex programme from C$17 mm to C$20 mm with two new wells being added to the FY21 drilling programme (exc ....