AUCTUS PUBLICATIONS
________________________________________
Arrow Exploration (AXL LN/CN)C; Target price of £0.80 per share: Reserves increase showcases FY24 drilling success – YE24 2P and 3P reserves are estimated at 13.6 mmboe and 22.3 mmboe, respectively. This represents an increase of 15% and 25%, respectively vs. YE23. Adding back FY24 production of 1.3 mmboe, the 2024 activity program has added approximately 2.8 mmboe of 2P reserves and 5.3 mmboe of 3P reserves at Tapir (overall increase ....

14 Mar 2025
AUCTUS ON FRIDAY - 14/03/2025
ShaMaran Petroleum Corp. (SNM:TSX), 0 | Petro Matad Limited (MATD:LON), 1.6 | Tenaz Energy Corp (TNZ:TSE), 0 | Equinor ASA (EQNR:STO), 0 | Equinor ASA (EQNR:OSL), 0 | Helix Exploration Plc (HEX:LON), 15.7 | Frontera Energy Corporation (FEC:TSE), 0 | Helium Evolution Incorporated (HEVI:TSX), 0 | Genel Energy PLC (GENL:LON), 54.3 | Valeura Energy Inc. (VLE:TSE), 0 | Arrow Exploration Corp. (AXL:LON), 16.8 | Zephyr Energy PLC (ZPHR:LON), 4.0 | Condor Energies Inc (CDR:TSE), 0

Sign up to access
Get access to our full offering from over 30 providers
Get access to our full offering from over 30 providers
AUCTUS ON FRIDAY - 14/03/2025
ShaMaran Petroleum Corp. (SNM:TSX), 0 | Petro Matad Limited (MATD:LON), 1.6 | Tenaz Energy Corp (TNZ:TSE), 0 | Equinor ASA (EQNR:STO), 0 | Equinor ASA (EQNR:OSL), 0 | Helix Exploration Plc (HEX:LON), 15.7 | Frontera Energy Corporation (FEC:TSE), 0 | Helium Evolution Incorporated (HEVI:TSX), 0 | Genel Energy PLC (GENL:LON), 54.3 | Valeura Energy Inc. (VLE:TSE), 0 | Arrow Exploration Corp. (AXL:LON), 16.8 | Zephyr Energy PLC (ZPHR:LON), 4.0 | Condor Energies Inc (CDR:TSE), 0
- Published:
14 Mar 2025 -
Author:
Stephane Foucaud -
Pages:
7 -
AUCTUS PUBLICATIONS
________________________________________
Arrow Exploration (AXL LN/CN)C; Target price of £0.80 per share: Reserves increase showcases FY24 drilling success – YE24 2P and 3P reserves are estimated at 13.6 mmboe and 22.3 mmboe, respectively. This represents an increase of 15% and 25%, respectively vs. YE23. Adding back FY24 production of 1.3 mmboe, the 2024 activity program has added approximately 2.8 mmboe of 2P reserves and 5.3 mmboe of 3P reserves at Tapir (overall increase ....