AUCTUS PUBLICATIONS
________________________________________
Condor Energies (CDR CN)C; Target price of C$5.90 per share: Imminent flow rate results for first horizontal well. LNG facility construction 90% complete. – 3Q25 production averaged 9,978 mboe/d, broadly in line with expectations. In Uzbekistan, drilling of a 1,000‑meter lateral section at the first horizontal well is underway, with numerous mud gas shows recorded. The lateral may be extended, and the well is expected to be brought ons ....
21 Nov 2025
AUCTUS ON FRIDAY - 21/11/2025
PANORO ENERGY (PEN:STO), 0 | Panoro Energy ASA (PEN:OSL), 0 | Valeura Energy Inc. (VLE:TSE), 0 | Ithaca Energy (IAE:TSE), 0 | Ithaca Energy PLC (ITH:LON), 154 | DNO ASA Class A (DNO:OSL), 0 | DNO (DNO:STO), 0 | BW Energy Ltd. (BWE:OSL), 0 | Afentra PLC (AET:LON), 41.4 | Petronor E&P (PNOR:STO), 0 | PetroNor E&P ASA (PNOR:OSL), 0 | Tullow Oil plc (TLW:LON), 6.5 | Zephyr Energy PLC (ZPHR:LON), 2.5 | Southern Energy Corp. (SOUC:LON), 4.5 | Criterium Energy Ltd (CEQ:TSX), 0 | Condor Energies Inc (CDR:TSE), 0 | Capricorn Energy PLC (CNE:LON), 221
Sign up to access
Get access to our full offering from over 100 providers
Get access to our full offering from over 100 providers
AUCTUS ON FRIDAY - 21/11/2025
PANORO ENERGY (PEN:STO), 0 | Panoro Energy ASA (PEN:OSL), 0 | Valeura Energy Inc. (VLE:TSE), 0 | Ithaca Energy (IAE:TSE), 0 | Ithaca Energy PLC (ITH:LON), 154 | DNO ASA Class A (DNO:OSL), 0 | DNO (DNO:STO), 0 | BW Energy Ltd. (BWE:OSL), 0 | Afentra PLC (AET:LON), 41.4 | Petronor E&P (PNOR:STO), 0 | PetroNor E&P ASA (PNOR:OSL), 0 | Tullow Oil plc (TLW:LON), 6.5 | Zephyr Energy PLC (ZPHR:LON), 2.5 | Southern Energy Corp. (SOUC:LON), 4.5 | Criterium Energy Ltd (CEQ:TSX), 0 | Condor Energies Inc (CDR:TSE), 0 | Capricorn Energy PLC (CNE:LON), 221
- Published:
21 Nov 2025 -
Author:
Stephane Foucaud -
Pages:
8 -
AUCTUS PUBLICATIONS
________________________________________
Condor Energies (CDR CN)C; Target price of C$5.90 per share: Imminent flow rate results for first horizontal well. LNG facility construction 90% complete. – 3Q25 production averaged 9,978 mboe/d, broadly in line with expectations. In Uzbekistan, drilling of a 1,000‑meter lateral section at the first horizontal well is underway, with numerous mud gas shows recorded. The lateral may be extended, and the well is expected to be brought ons ....